When the Customer Won't Pay: What a Contractor Can Do, Step by Step and State by State
Devon Davila · 2026-10-28
When the customer does not pay, US law gives a contractor a four-rung ladder: the demand letter, statutory interest, small-claims court, and the mechanics lien on the property. Which rung to use depends on how much is owed, which state the house is in, and, before anything else, whether you held the license the job required. Each rung has a deadline. The lien's is the shortest and the one most contractors lose without knowing it.
Quick answer: A contractor who is not paid in the United States has four tools, in this order: a written demand letter with a deadline (there is no statutory form; California's small-claims form only asks whether you demanded payment), statutory interest on the debt where the contract is silent (10 percent a year in California, 6 percent in Texas from the 30th day, the CFO's quarterly rate in Florida, 8.06 percent in the third quarter of 2026), small-claims court (up to $12,500 for individuals and $6,250 for an LLC or corporation in California, $20,000 in Texas, $8,000 in Florida, $10,000 in Nevada, Illinois, North Carolina and New York City, $15,000 in Georgia, $5,000 in Arizona, New Jersey and Virginia), and a mechanics lien on the property, which has short deadlines that run from completion, not from the invoice due date: 90 days in California and Florida, the 15th day of the third month after completion in Texas, 120 days in Arizona and North Carolina, 90 in Nevada and Georgia, four months in Illinois and on a single-family house in New York. Before any of that, check your license: in California, Florida, Arizona, Nevada and Georgia a contractor who lacked the license the job required cannot sue to collect, and in California the customer can sue to get back what they already paid. On an owner-occupied house, several states also bar or condition the lien if the owner has paid the prime contractor or never received a statutory notice in the contract.
First, the question that decides everything: were you licensed?
In five of the largest licensing states, a contractor who did work that required a license without holding it cannot sue to collect. Not in small claims, not in any court, and in most of them cannot lien either.
If the job was under your state's licensing threshold (see the companion guide on handyman license limits by state), the bar does not apply. If it was over and you were unlicensed, the honest answer is that the law will not help you collect, and in California it exposes you to refunding what you were paid. Negotiate.
| State | What the statute says | Citation | Verified |
|---|---|---|---|
| California | No contractor "may bring or maintain any action … for the collection of compensation … where a license is required by this chapter without alleging that they were a duly licensed contractor at all times during the performance." Worse: the customer "may bring an action … to recover all compensation paid to the unlicensed contractor." | B&P §7031(a), (b) | 2026-10-26 |
| Florida | "contracts entered into on or after October 1, 1990, by an unlicensed contractor shall be unenforceable in law or in equity by the unlicensed contractor." No lien either. | Fla. Stat. §489.128(1) | 2026-10-26 |
| Arizona | No contractor may "commence or maintain any action in any court of the state for collection of compensation … without alleging and proving that the contracting party … was a duly licensed contractor when the contract sued upon was entered into and when the alleged cause of action arose." | A.R.S. §32-1153 | 2026-10-26 |
| Nevada | No person acting as a contractor "shall bring or maintain any action in the courts of this State for the collection of compensation … without alleging and proving that such person … was a duly licensed contractor at all times during the performance of such act or contract and when the job was bid." | NRS 624.320 | 2026-10-26 |
| Georgia | Contracts by an unlicensed contractor "shall be unenforceable in law or in equity by the unlicensed contractor" and "no lien or bond claim shall exist in favor of the unlicensed contractor." | O.C.G.A. §43-41-17(b) | 2026-10-26 |
| Texas | No state general-contractor license, so no equivalent bar for general work. State-licensed trades (plumbing, electrical, HVAC) are governed by their own statutes. | — | 2026-10-26 |
Errata: what the ranking pages get wrong
| What they say | What the statute says |
|---|---|
| "You have 90 days to file a lien in Texas" | Texas counts by months, not days. On residential construction the affidavit is due "not later than the 15th day of the third month after the month in which the original contractor's work was completed, terminated, or abandoned" (Prop. Code §53.052(a)(2)). |
| "Charge a 1.5% monthly late fee" | In Texas, interest above 10 percent a year without a written agreement is usurious (Fin. Code §302.001(b)); 1.5 percent a month is 18 percent a year and is the statutory rate only when the chapter 28 prompt-payment act applies. In Florida, 18 percent a year is the usury line (§687.02). In California, with no agreed rate, the law sets 10 percent (Civ. Code §3289(b)). |
| "Unlicensed contractors can still sue in small claims" | Not in California (§7031), Florida (§489.128), Arizona (§32-1153), Nevada (624.320) or Georgia (§43-41-17(b)). |
| "File the lien and you're protected" | In California the lien is "unenforceable as a matter of law" if not served on the owner with the statutory notice and a proof of service (Civ. Code §8416(e)), and it expires unless suit is filed within 90 days (§8460). In Florida the contractor must give a final affidavit at least five days before suing or has "no lien or right of action" (§713.06(3)(d)1). In Texas, on a homestead, there is no lien without a written contract signed before work began (§53.254). |
| "Any contractor can lien any house" | See section 8. Several states bar or condition the lien on an owner-occupied residence when the owner has paid the prime contractor or never received a statutory notice in the contract. |
| "Each state has a minimum amount, usually $2,000, you need to sue" (Jobber Academy) | No state sets a $2,000 floor. Oregon is the only state with a floor rule and it runs the other way: claims of $750 or less must be filed in small claims (ORS 46.405(2)). |
| "Unlicensed contractors never have lien rights" (Knowify) | Ohio, Colorado, Indiana and Missouri have no state general-contractor license, so there is nothing to be unlicensed under; Tennessee caps damages at documented expenses rather than barring the lien (T.C.A. 62-6-103(b)). |
| "Send a formal notice through a lawyer first" | No state statute prescribes the form of a demand letter between a contractor and a homeowner. California's small-claims form only requires stating that the plaintiff, "where possible, has demanded payment" (CCP §116.320(b)(3)). |
The collection ladder, by amount
Read this section as a decision tree. The dollar figures are the small-claims ceilings in section 6 and the lien deadlines in section 7.
- Written reminder the day the invoice is due. Text or email with the invoice number, amount and a date. This is not the demand letter; it is notice that the letter is coming.
- Demand letter at 7 to 14 days. Section 4. In California this letter is also the "notice demanding payment" that starts the 30-day clock of Civil Code §8800 and, if the owner withholds an undisputed amount, the 2 percent per month penalty.
- If the debt fits in small claims, file there. No lawyer, low filing fee, hearing in weeks or months. Section 6.
- If there is property, the lien is still available to you (section 8), and you are inside the deadline, record the lien. The lien does not collect by itself; it forces the issue before the owner can sell or refinance cleanly, and gives you the right to foreclose. Section 7. The deadlines run from completion, not from the due date, so decide this in parallel with step 2, not after step 3.
- If the debt exceeds small claims and the lien did not resolve it, a lawyer. In California, Texas and Florida the prompt-payment statutes award attorney fees or high interest to the winner (section 5), which makes counsel viable on mid-sized debts.
The economics of a small lien. Recording fees are typically $20 to $100, a lien service charges $200 to $400 to prepare and serve, and foreclosing a lien is a lawsuit in the regular civil court, not small claims. On a $1,500 invoice the lien is leverage, not recovery: it works if the owner is about to sell or refinance, and otherwise it sits until it expires (90 days to one year, section 7) unless you sue. For debts under the small-claims ceiling, the small-claims judgment is usually the cheaper and faster instrument, and in most states a recorded judgment becomes a lien of its own.
The demand letter: what it is and is not
It has no statutory form. No statute in California, Texas or Florida prescribes the contents of a demand letter between a contractor and a homeowner. What matters is that it exists, is dated, states how much and by when, and that you can prove you sent it.
It does serve as evidence. California's small-claims form (SC-100) requires the plaintiff to state that they, "where possible, [have] demanded payment" (CCP §116.320(b)(3)). Florida's prompt-payment act runs only once the contractor "has furnished the obligor with a written request for payment" (§715.12(4)(a)). Texas's 35-day clock under chapter 28 runs from when the owner "receives the request" in writing (§28.002(a)). The demand letter is that document.
You are not a "debt collector." The federal Fair Debt Collection Practices Act regulates third parties collecting consumer debts. Its definition of "debt collector" excludes a creditor collecting its own debt in its own name (15 U.S.C. §1692a(6)). State consumer-protection statutes still apply to how you collect, which is why the "what not to include" list below matters.
What it should contain.
- Your legal business name, address, phone and license number.
- The customer's name and the property address.
- Invoice number, date of the work, due date, amount owed.
- The interest you will apply and from when (section 5). If the contract set no rate, use your state's legal rate.
- A concrete deadline (10 days is reasonable) and what follows: small claims and, where available, a lien.
- How to pay: link, check, transfer.
- Language: if the contract was in Spanish, the letter in Spanish with an English copy. The English copy is the one a small-claims judge will read.
What it should not contain. Threats of harm, of reporting the customer to immigration, of removing installed materials, or of "filing a lien" in a state where you are unlicensed and therefore have no lien right. A false or threatening demand letter turns you into the defendant under your state's consumer-protection act.
Template:
Demand for Payment. Date: ____. Re: Invoice #____ for work completed on ____ at ____ (property address). Amount due: $____. This invoice was due on ____. Despite our reminder of ____, it remains unpaid. Please pay in full by ____ (10 days from this letter). Beginning ____, the unpaid balance accrues interest at ____ % per year [the rate stated in our contract / the legal rate under (Cal. Civ. Code §3289 / Tex. Fin. Code §302.002 / Fla. Stat. §687.01)]. If payment is not received by that date, we will file a claim in small claims court [and record a mechanics lien against the property as permitted by (Cal. Civ. Code §8412 / Tex. Prop. Code §53.052 / Fla. Stat. §713.08)]. Pay online at ____ or by check to ____. — (Company, license #, phone)
Interest and prompt payment: what the law lets you charge
5a. California, Texas and Florida
How to use this. If your contract already says "1.5% per month," in Texas that is 18 percent a year and exceeds the 10 percent the law allows unless "otherwise provided by law"; chapter 28 is that "otherwise," but only for the payments that chapter covers. In California the 2 percent per month of §8800 is a statutory penalty, not an interest rate you invent, and it comes with attorney fees. In Florida the §715.12 formula (the CFO rate plus 12 points) currently yields about 20 percent a year on overdue payments under written contracts with lien rights. Put your state's rate in the contract, and cite the section in the demand letter.
| State | No agreed rate | Usury ceiling | Prompt-payment act (owner → direct contractor) | Verified |
|---|---|---|---|---|
| California | "the obligation shall bear interest at a rate of 10 percent per annum after a breach" (Civ. Code §3289(b)) | — | The owner "shall pay the direct contractor, within 30 days after notice demanding payment pursuant to the contract is given, any progress payment due as to which there is no good faith dispute"; otherwise "a penalty of 2 percent per month on the amount wrongfully withheld, in place of any interest otherwise due," plus "costs and a reasonable attorney's fee" to the prevailing party (Civ. Code §8800) | 2026-10-26 |
| Texas | "legal interest at the rate of six percent a year on the principal amount," from "the 30th day after the date on which the amount is due" (Fin. Code §302.002) | "The maximum rate or amount of interest is 10 percent a year except as otherwise provided by law. A greater rate of interest than 10 percent a year is usurious unless otherwise provided by law." (§302.001(b)) | The owner pays "not later than the 35th day after the date the owner receives the request" (Prop. Code §28.002(a)); in a good-faith dispute on a "detached single-family residence, duplex, triplex, or quadruplex" the owner may withhold "not more than 110 percent of the difference" (§28.003); unpaid amounts "bear interest at the rate of 1-1/2 percent each month" (§28.004(b)) | 2026-10-26 |
| Florida | "the rate is the rate provided for in s. 55.03" (§687.01): set by the CFO each quarter; "beginning July 1, 2026, at 8.06% per annum" (Florida Bar News, 2026-07-01); changes January 1, April 1, July 1 and October 1 | Above "18 percent per annum simple interest" is usury (§687.02(1)) | Applies to "written contracts to improve real property … for which a construction lien is authorized" (§715.12(1)), with no residential exclusion; payment is due once the contractor has delivered "a written request for payment" and the §713.06 affidavits; overdue amounts "shall bear interest at the rate specified in s. 55.03 plus an additional 12 percent per annum, computed beginning on the 14th day after payment is due" (§715.12(5)(a)) | 2026-10-26 |
5b. Legal rate when the contract is silent, 14 more states
The 1.5 percent per month problem. Three of the pages ranking for "late fee on unpaid invoice" present 1.5 percent a month (18 percent a year) as the standard. Minnesota caps a written rate at 8 percent a year; Michigan at 7 percent; Wisconsin and Pennsylvania default to 5 and 6 percent absent a written rate; Texas treats anything over 10 percent without a written agreement as usury. A late-fee clause is enforceable only where the rate is lawful in the state where the house sits.
| State | Rate when the contract is silent | Statute | Verified |
|---|---|---|---|
| Pennsylvania | 6% a year: "with interest" without a stated rate "shall be construed to refer to the rate of interest of six per cent per annum" | 41 P.S. §202 | 2026-10-28 |
| Ohio | Federal short-term rate "rounded to the nearest whole number per cent, plus three per cent"; 7% for 2026 | R.C. 1343.03(A), 5703.47 | 2026-10-28 (M on the 2026 figure) |
| Michigan | 5%: "$5.00 upon $100.00 for a year"; a written agreement may go to 7% | MCL 438.31 | 2026-10-28 |
| Washington | "twelve percent per annum where no different rate is agreed to in writing" | RCW 19.52.010(1) | 2026-10-28 |
| Colorado | "eight percent per annum compounded annually" when there is "no agreement as to the rate" | C.R.S. 5-12-102 | 2026-10-28 |
| Massachusetts | Contract damages carry interest "at the contract rate, if established, or at the rate of twelve per cent per annum from the date of the breach or demand"; the general legal rate is 6% | G.L. c.231 §6C; c.107 §3 | 2026-10-28 |
| Maryland | 6%: "The Legal Rate of Interest shall be Six per cent per annum" | Md. Const. art. III §57; CL §12-102 | 2026-10-28 |
| Minnesota | 6%: "$6 upon $100 for a year, unless a different rate is contracted for in writing"; written cap "$8 on $100 for one year" | Minn. Stat. 334.01 | 2026-10-28 |
| Tennessee | 10% is the maximum "for all other transactions" where no rate is agreed, not an automatic entitlement | T.C.A. 47-14-103(3) | 2026-10-28 |
| Indiana | "eight percent (8%) per annum" absent agreement | IC 24-4.6-1-102 | 2026-10-28 |
| Missouri | "nine percent per annum, when no other rate is agreed upon … on written contracts, and on accounts after they become due and demand of payment is made" | RSMo 408.020 | 2026-10-28 |
| Wisconsin | 5%: "$5 upon the $100 for one year" unless a different rate is "clearly expressed in writing" | Wis. Stat. 138.04 | 2026-10-28 |
| Oregon | "if the parties have not otherwise agreed to a rate of interest, is nine percent per annum" | ORS 82.010(1) | 2026-10-28 |
| Utah | "the legal rate of interest for the contract … is 10% per annum" unless the parties "expressly specify a different rate" | Utah Code 15-1-1(2) | 2026-10-28 |
Small-claims ceilings by state
Small claims is the court built for this: no lawyer, simple forms, a low fee, a short hearing. The ceiling is the most you can claim there; if you are owed more, you can sue for the ceiling and waive the rest, or file in the regular civil court.
A note for California. The $6,250 ceiling for businesses surprises people: if your company is an LLC or corporation, the company is the plaintiff and the ceiling is $6,250, not $12,500. A contractor operating as a sole proprietor with a DBA uses the $12,500 ceiling.
| State | Ceiling | Detail | Statute or rule | Verified |
|---|---|---|---|---|
| California | $12,500 for individuals; $6,250 for an LLC or corporation | "in an action brought by a natural person, if the amount of the demand does not exceed twelve thousand five hundred dollars ($12,500)"; all others, "six thousand two hundred fifty dollars ($6,250)" | CCP §116.221, §116.220(a) | 2026-10-26 |
| Texas | $20,000 (justice court) | "the amount in controversy is not more than $20,000, exclusive of interest" | Gov't Code §27.031(a)(1) | 2026-10-26 |
| Florida | $8,000 (county court, small claims) | "a demand for money or property, the value of which does not exceed $8,000 exclusive of costs, interest, and attorneys' fees" | Fla. Sm. Cl. R. 7.010(b) | 2026-10-26 (M) |
| Arizona | $5,000 small claims; $10,000 justice court | Small claims: "$5,000, exclusive of interest and costs"; justice court: "ten thousand dollars or less" | A.R.S. §22-503, §22-201 | 2026-10-26 |
| Nevada | $10,000 | "the amount claimed does not exceed $10,000" | NRS 73.010 | 2026-10-26 |
| New York | $10,000 in New York City; $3,000 in town and village courts | "not in excess of ten thousand dollars exclusive of interest and costs"; "not in excess of three thousand dollars" | NYC Civil Court Act §1801; UJCA §1801 | 2026-10-26 |
| New Jersey | $5,000 | "You can sue for up to $5,000 in small claims court." | NJ Courts, Special Civil Part | 2026-10-26 |
| Illinois | $10,000 | "a civil action based on either tort or contract for money not in excess of $10,000, exclusive of interest and costs" | Ill. Sup. Ct. R. 281 | 2026-10-26 |
| Georgia | $15,000 (magistrate court) | "the amount demanded or the value of the property claimed does not exceed $15,000.00" | O.C.G.A. §15-10-2(a)(5) | 2026-10-26 |
| North Carolina | $10,000 | "ten thousand dollars ($10,000)" | G.S. 7A-210(1) | 2026-10-26 |
| Virginia | $5,000 | "when the amount claimed does not exceed $5,000, exclusive of interest" | Va. Code §16.1-122.2 | 2026-10-26 |
| Pennsylvania | $12,000 (magisterial district court) | "sum demanded does not exceed $12,000, exclusive of interest and costs" | 42 Pa.C.S. §1515(a)(3) | 2026-10-28 |
| Ohio | $6,000 | "amounts not exceeding six thousand dollars, exclusive of interest and costs" | R.C. 1925.02(A)(1) | 2026-10-28 |
| Michigan | $7,000 | "Beginning January 1, 2024, $7,000.00" | MCL 600.8401 | 2026-10-28 |
| Washington | $10,000 for an individual; $5,000 for a business | RCW 12.40.010 | RCW 12.40.010 | 2026-10-28 |
| Colorado | $7,500 | "exclusive of interest and costs, does not exceed seven thousand five hundred dollars" | C.R.S. 13-6-403(1)(a) | 2026-10-28 |
| Massachusetts | $7,000 | "does not claim as debt or damages more than $7,000" | G.L. c.218 §21 | 2026-10-28 |
| Maryland | $5,000 | "amount claimed does not exceed $5,000 exclusive of interest, costs, and attorney's fees" | CJ §4-405 | 2026-10-28 |
| Minnesota | $20,000 (conciliation court) | "does not exceed: (1) $20,000" | Minn. Stat. 491A.01 subd. 3a | 2026-10-28 |
| Tennessee | $25,000 (general sessions) | "shall extend to the sum of twenty-five thousand dollars ($25,000) in all civil cases" | T.C.A. 16-15-501(d)(1) | 2026-10-28 |
| Indiana | $10,000 | "not more than ten thousand dollars ($10,000)" | IC 33-29-2-4(b)(1) | 2026-10-28 |
| Missouri | $5,000 | "amount in controversy does not exceed five thousand dollars" | RSMo 482.305 | 2026-10-28 |
| Wisconsin | $10,000; $15,000 from 2027-01-01 | 2025 Wis. Act 105 | Wis. Stat. 799.01(1)(d) | 2026-10-28 |
| Oregon | $10,000; claims of $750 or less must be filed in small claims | ORS 46.405(2)-(3) | ORS 46.405 | 2026-10-28 |
| Utah | $20,000 through 2029; $25,000 from 2030 | "including attorney fees but exclusive of court costs and interest" | Utah Code 78A-8-102(1) | 2026-10-28 |
The mechanics lien: deadlines that do not forgive
A mechanics lien is a claim against the property, recorded with the county. It does not pay you; it gives you leverage. An owner with a recorded lien cannot sell or refinance cleanly until it is resolved, and you can sue to foreclose it. But every state conditions it on short deadlines and formal requirements, and missing one is losing the lien.
7a. California, Texas and Florida in detail
| California | Texas (residential) | Florida | |
|---|---|---|---|
| Preliminary notice | The direct contractor "is required to give preliminary notice only to the construction lender" (Civ. Code §8200(e)(2)); not to the owner, who already has a contract with you | On a homestead: a written contract "executed before the material is furnished or the labor is performed," "signed by both spouses" if the owner is married, and "filed with the county clerk" (Prop. Code §53.254). Without it, no lien on the family home | A direct contract over $2,500 must carry the lien-law notice "in no less than 12-point, capitalized, boldfaced type" (§713.015(1)); omitting it "does not bar the enforcement of a lien against a person who has not been adversely affected" |
| Deadline to record | After completing the contract "and before the earlier of … (a) Ninety days after completion of the work of improvement. (b) Sixty days after the owner records a notice of completion or cessation." (§8412) | Lien affidavit "not later than the 15th day of the third month after the month in which the original contractor's work was completed, terminated, or abandoned" (§53.052(a)(2)) | "not later than 90 days after the final furnishing of the labor or services or materials by the lienor" (§713.08(5)) |
| Service on the owner | The lien must include the "Notice of Mechanics Lien" and a proof of service affidavit; without service it is "unenforceable as a matter of law" (§8416) | The affidavit must carry in 10-point bold "NOTICE: THIS IS NOT A LIEN. THIS IS ONLY AN AFFIDAVIT CLAIMING A LIEN." and be sent to the owner (§53.254) | "The claim of lien shall be served on the owner" before recording or "within 15 days after recording"; otherwise voidable to the extent of prejudice (§713.08(4)(c)) |
| Before suing | — | — | Contractor's final affidavit to the owner "at least 5 days before instituting an action"; without it, "The contractor shall have no lien or right of action against the owner" (§713.06(3)(d)1) |
| Deadline to sue | "within 90 days after recordation of the claim of lien" (§8460(a)) | "not later than the first anniversary of the last day a claimant may file the lien affidavit" (§53.158), extendable to the second anniversary by written agreement | "1 year after the claim of lien has been recorded" (§713.22(1)); the owner can shorten it to "60 days from the date of service" with a notice of contest (§713.22(2)) |
7b. Lien filing deadline, direct contractor, 21 more states
Three mistakes that void the lien. Recording late (the clock runs from completion, not from the due date). Not serving the owner as the statute requires (California and Florida). And in Texas, working on a homestead without the contract signed by both spouses and recorded before starting.
| State | Deadline to record (direct contractor) | Statute | Verified |
|---|---|---|---|
| Arizona | "within one hundred twenty days after completion," or "within sixty days after recordation" of a notice of completion | A.R.S. §33-993 | 2026-10-26 |
| Nevada | 90 days after completion or last delivery; 40 days if a notice of completion was recorded and served; suit within 6 months of recording | NRS 108.226(1), 108.233 | 2026-10-26 |
| New York | Single-family house: "within four months after the completion of the contract, or the final performance of the work, or the final furnishing of the materials"; other projects, eight months | Lien Law §10 | 2026-10-26 |
| New Jersey | Residential: first a Notice of Unpaid Balance "within 60 days following the last date that work, services, material or equipment were provided," an arbitration demand "within 10 days," and the lien "within 10 days of the lien claimant's receipt of the determination," within 120 days of last work | N.J.S.A. 2A:44A-21, -6 | 2026-10-26 |
| Illinois | "within 4 months after completion" record the lien or sue, to bind third parties | 770 ILCS 60/7(a) | 2026-10-26 |
| Georgia | "within 90 days after the completion of the work"; suit "within 365 days from the date of filing" | O.C.G.A. §44-14-361.1 | 2026-10-26 |
| North Carolina | "not later than 120 days after the last furnishing of labor or materials at the site" | G.S. 44A-12(b) | 2026-10-26 |
| Pennsylvania | "within six (6) months after the completion of his work" | 49 P.S. §1502(a)(1) | 2026-10-28 |
| Ohio | One- or two-family dwelling: "within sixty days from the date on which the last labor or work was performed or material was furnished"; other projects 75 days | R.C. 1311.06(B)(1), (B)(3) | 2026-10-28 |
| Michigan | "within 90 days after the lien claimant's last furnishing of labor or material" | MCL 570.1111(1) | 2026-10-28 |
| Washington | "not later than ninety days after the person has ceased to furnish labor"; foreclose within "eight calendar months after the claim of lien has been recorded" | RCW 60.04.091, 60.04.141 | 2026-10-28 |
| Colorado | "before the expiration of four months after the day on which the last labor is performed"; notice of intent "at least ten days before" recording | C.R.S. 38-22-109(5), (3) | 2026-10-28 |
| Massachusetts | Notice of contract by the earliest of 60 days after a notice of substantial completion, 90 days after a notice of termination, or 90 days after last work; statement of account and suit "within ninety days after the filing of the statement" | G.L. c.254 §§2, 8, 11 | 2026-10-28 |
| Maryland | Petition in circuit court "within 180 days after the work has been finished or the materials furnished" | RP §9-105(a) | 2026-10-28 |
| Minnesota | "The lien ceases at the end of 120 days after doing the last of the work … unless within this period: (1) a statement of the claim is filed" and served | Minn. Stat. 514.08 subd. 1 | 2026-10-28 |
| Tennessee | The prime contractor's lien "shall continue for one (1) year after the date the improvement is complete" without recording as against the owner; record within 90 days to bind purchasers | T.C.A. 66-11-106, 66-11-112(a) | 2026-10-28 |
| Indiana | Residential: "not later than sixty (60) days after performing labor or furnishing materials"; suit "not later than one (1) year" | IC 32-28-3-3(b), 32-28-3-6(a) | 2026-10-28 |
| Missouri | "within six months after the indebtedness shall have accrued" | RSMo 429.080 | 2026-10-28 |
| Wisconsin | "within 6 months from the date the lien claimant performed, furnished, or procured the last labor"; written notice of intent "at least 30 days before" filing | Wis. Stat. 779.06(1)-(2) | 2026-10-28 |
| Oregon | "not later than 75 days after the person has ceased to provide labor … or 75 days after completion of construction, whichever is earlier" | ORS 87.035(1) | 2026-10-28 |
| Utah | Preliminary notice "no later than 20 days after" starting work (no exemption for the original contractor); lien within 180 days of final completion, or 90 days after a notice of completion | Utah Code 38-1a-501, 38-1a-502 | 2026-10-28 |
The owner-occupied carve-outs the lien services don't lead with
Lien-filing services sell the lien as a right that follows the work. On an owner-occupied house in the fourteen states we added, the lien is conditioned in one of three ways, and the first one costs direct contractors their lien more often than any missed deadline.
8a. Six states make your own lien contingent on a notice you give before the work
| State | What the direct contractor must do, or lose the lien | Statute | Verified |
|---|---|---|---|
| Washington | On residential work of four units or fewer "when the bid or contract price totals one thousand dollars or more," give the statutory disclosure statement; "No contractor subject to this section may bring or maintain any lien claim … without alleging and proving that the contractor has provided the customer with a copy of the disclosure statement" | RCW 18.27.114(1)(a), (4) | 2026-10-28 |
| Oregon | On a residential contract over $2,000, deliver the "Information Notice to Owner"; otherwise "the original contractor may not claim any lien created under ORS 87.010" | ORS 87.093(4), (6) | 2026-10-28 |
| Missouri | Give the ten-point bold consumer notice "prior to receiving payment in any form"; compliance "shall be a condition precedent to the creation, existence or validity of any mechanic's lien in favor of such original contractor" | RSMo 429.012.1-.2 | 2026-10-28 |
| Minnesota | A contractor "who has contracted or will contract with any subcontractors or material suppliers … shall include in any written contract with the owner the notice"; "A person who fails to provide the notice shall not have the lien and remedy provided by this chapter." A solo contractor using no subs is outside the trigger. | Minn. Stat. 514.011 subd. 1 | 2026-10-28 |
| Wisconsin | Same structure: a prime contractor who uses subs or suppliers must include the statutory notice in the written contract, or "does not have the lien and remedy provided by this subchapter" | Wis. Stat. 779.02(2)(a), (c) | 2026-10-28 |
| Michigan | "A contractor does not have a right to a construction lien on the interest of an owner or lessee in a residential structure unless the contractor has provided an improvement … under a written contract" containing the licensing statement and license number; an owner may sue to discharge a lien recorded by an unlicensed contractor | MCL 570.1114, 570.1114a | 2026-10-28 |
| Indiana | A person who "sells or furnishes on credit any material, labor, or machinery for the alteration or repair of an owner occupied single or double family dwelling" must give written notice within 30 days of first work; "The furnishing of the notice is a condition precedent to the right of acquiring a lien." Whether a direct contractor is within the rule is not settled in the text; send it. | IC 32-28-3-1(h) | 2026-10-28 (M) |
8b. Seven states let an owner who paid the prime in full defeat subcontractor liens
Pennsylvania (49 P.S. §1301(b), one- or two-unit residence used as the owner's home), Ohio (R.C. 1311.011(B)(1), payment before receiving the lien affidavit), Michigan (MCL 570.1118a, owner's affidavit of payment), Washington (RCW 60.04.031(3)(b), subs limited to "amounts not yet paid to the prime contractor"), Colorado (C.R.S. 38-22-102(3.5), an "affirmative defense" on an owner-occupied single-family home), Maryland (RP §9-104(f)(3), a dwelling "being erected," so not a remodel) and Utah (38-11-107, 38-11-204(4), licensed original contractor paid in full). In every one of them the defense protects the owner against subcontractors and suppliers, not against you: if the owner has not paid you, your lien survives. The practical point runs the other way. If you are the sub on a residential job and the owner paid the general, in these states you have no lien on the house; your claim is against the general.
8c. Two states give the residential lien to the prime only
Tennessee: "On contracts to improve residential real property, a lien or right of lien on the property shall exist only in favor of a prime contractor" (T.C.A. 66-11-146(a)(2), one to four units, owner's principal residence). Missouri: "No person, other than an original contractor, who performs any work … shall have a lien … unless an owner … pursuant to a written contract has agreed to be liable" (RSMo 429.013.2, owner-occupied, four units or fewer, repair or remodel). If you contract directly with the homeowner in these states, your lien is intact; your subs' is not.
8d. Licensing and registration bars in the fourteen states
| State | Rule | Statute | Verified |
|---|---|---|---|
| Michigan | No action for compensation "without alleging and proving that the person was licensed" | MCL 339.2412(1) | 2026-10-28 |
| Washington | No action "without alleging and proving that he or she was a duly registered contractor" | RCW 18.27.080 | 2026-10-28 |
| Oregon | An unlicensed contractor "may not perfect a construction lien … or commence an arbitration or a claim in a court of this state for compensation" | ORS 701.131(1) | 2026-10-28 |
| Utah | No action "for collection of compensation … without alleging and proving that the … contractor … was appropriately licensed" | Utah Code 58-55-604 | 2026-10-28 |
| Minnesota | "An unlicensed person who knowingly violates sections 326B.802 to 326B.885 has no right to claim a lien under section 514.01 and the lien is void." | Minn. Stat. 326B.845 subd. 2 | 2026-10-28 |
| Tennessee | An unlicensed contractor "shall not be permitted to recover any damages in any court other than actual documented expenses that can be shown by clear and convincing proof" | T.C.A. 62-6-103(b) | 2026-10-28 |
| Pennsylvania | "No home improvement contract shall be valid or enforceable against an owner unless it" is in writing and "contains the home improvement contractor registration number"; recovery of reasonable value is limited to contractors who complied | 73 P.S. §517.7(a), (g) | 2026-10-28 |
| Maryland | "a person may not act or offer to act as a contractor in the State unless the person has a contractor license"; Maryland courts have denied recovery to unlicensed home-improvement contractors | Bus. Reg. §8-601(a) | 2026-10-28 (M on the case law) |
| Ohio, Colorado, Indiana, Missouri | No state general-contractor license, so no state-level bar (trade licenses have their own rules) | — | 2026-10-28 |
| Massachusetts, Wisconsin | Registration required, but neither statute bars an unregistered contractor from suing; in Massachusetts operating without registration is an unfair practice under chapter 93A | G.L. c.142A §17; Wis. Stat. 101.654 | 2026-10-28 |
Statutes of limitation: how long you have to sue on the debt
The limitation period is for suing on the debt. The lien deadline (section 7) is separate, much shorter, and does not extend because the debt is still alive.
| State | Written contract | Oral contract or open account | Statute | Verified |
|---|---|---|---|---|
| California | 4 years: "Within four years: (a) An action upon any contract, obligation or liability founded upon an instrument in writing" | 2 years (CCP §339; not re-verified this pass) | CCP §337 | 2026-10-26 |
| Texas | 4 years, "debt" | 4 years | CPRC §16.004(a)(3) | 2026-10-26 |
| Florida | 5 years: "A legal or equitable action on a contract, obligation, or liability founded on a written instrument" | 4 years: "not founded on a written instrument, including an action for the sale and delivery of goods, wares, and merchandise, and on store accounts" | §95.11(2)(b), (3)(j) | 2026-10-26 |
| Pennsylvania | 4 years | 4 years | 42 Pa.C.S. §5525(a) | 2026-10-28 |
| Ohio | 6 years | 4 years | R.C. 2305.06, 2305.07(A) | 2026-10-28 |
| Michigan | 6 years | 6 years | MCL 600.5807(9) | 2026-10-28 |
| Washington | 6 years | 3 years | RCW 4.16.040(1), 4.16.080(3) | 2026-10-28 |
| Colorado | 3 years for contracts generally, but 6 years for "a liquidated debt or an unliquidated, determinable amount of money due," which is what an unpaid invoice is | 3 years | C.R.S. 13-80-101(1)(a), 13-80-103.5(1)(a) | 2026-10-28 |
| Massachusetts | 6 years | 6 years | G.L. c.260 §2 | 2026-10-28 |
| Maryland | 3 years | 3 years | CJ §5-101 | 2026-10-28 |
| Minnesota | 6 years | 6 years | Minn. Stat. 541.05 subd. 1(1) | 2026-10-28 |
| Tennessee | 6 years | 6 years | T.C.A. 28-3-109(a)(3) | 2026-10-28 |
| Indiana | 6 years for a written contract "for the payment of money"; 10 years for other written contracts | 6 years | IC 34-11-2-7, -9, -11 | 2026-10-28 |
| Missouri | 10 years for "any writing … for the payment of money"; 5 years otherwise | 5 years | RSMo 516.110(1), 516.120(1) | 2026-10-28 |
| Wisconsin | 6 years | 6 years | Wis. Stat. 893.43(1) | 2026-10-28 |
| Oregon | 6 years | 6 years | ORS 12.080(1) | 2026-10-28 |
| Utah | 6 years | 4 years | Utah Code 78B-2-309(1)(b), 78B-2-307(1)(a) | 2026-10-28 |
What not to do
- Do not take anything back. Installed materials are part of the house. Removing them is property damage and, in some states, a crime.
- Do not threaten a lien you do not have. Unlicensed in California, Florida, Arizona, Nevada or Georgia, you have none. A lien recorded without a right to it exposes you to damages, and several states penalize a knowingly false lien.
- Do not charge interest the law does not allow. Texas, 10 percent a year without an agreement; Florida, 18 percent. A usurious rate in the demand letter is a free argument for the customer.
- Do not threaten immigration, police or reputation. It is the shortest path to being the defendant under your state's consumer-protection act.
- Do not wait for the invoice to "age." The lien clock runs from completion. Decide the lien the same week you send the letter.
Method and limits
We read each statute on the legislature's site, the court's official page or, where those sites block automated access, a code mirror, on the dates shown. California, Texas and Florida are covered in depth; for the other states we verified the small-claims ceiling, the direct contractor's lien filing deadline, the residential carve-out where one exists, the limitation period and the legal interest rate, not the full procedure. The lien deadlines in section 7 are the direct contractor's (the one who contracted with the owner); subcontractors and suppliers have preliminary notices and deadlines this guide does not cover. Court fees and judgment-enforcement procedures vary by county and are described in general. Florida's rate changes quarterly; we cite the third quarter of 2026 and the page where the current rate is published.
Last verified: 2026-10-28. Not legal advice.
Do I need a lawyer for small claims?
No. Small-claims courts are designed to be used without one; in California and several other states lawyers may not even represent the parties at the hearing. Bring the contract, the invoice, photos of the completed work, the demand letter and proof you sent it.
Can I sue for more than the ceiling?
You can sue in small claims for the ceiling and waive the rest, or sue for the full amount in the regular civil court, with higher cost and longer timelines. In Texas the $20,000 ceiling covers most residential jobs.
Does a lien work if the customer rents the house?
The lien attaches to the property, not the tenant. If the tenant and not the owner hired you, your lien right depends on rules this guide does not cover; ask before recording.
My customer says the work is defective. Can I still collect?
You can sue; the customer will counterclaim. In Texas the owner may withhold, for a good-faith dispute, up to "110 percent of the difference" on one-to-four-unit homes (Prop. Code §28.003). In California the 2 percent per month penalty applies only to amounts not "in good faith dispute" (Civ. Code §8800). Document the work with photos and a signed completion checklist.
Can I send the debt to a collection agency or report it to a credit bureau?
Yes, but the agency takes a percentage, and a consumer debt is reported only under the federal credit-reporting rules. For debts under the small-claims ceiling, the lawsuit is usually faster and cheaper.
What does the court charge?
It depends on the county and the amount; generally $30 to $100 in small claims. If you win, the court normally adds costs to the judgment.
I won in small claims and the customer still won't pay. Now what?
The judgment lets you garnish bank accounts and wages and record the judgment against real property, under each state's procedures. The judgment accrues interest (in Florida, the CFO rate; in California, 10 percent). A recorded judgment is, in practice, a second lien.
Is a late fee the same as interest?
Courts in most states treat a flat late fee on a consumer contract as liquidated damages, enforceable only if it is a reasonable estimate of the harm and was agreed in the signed contract. A percentage "late fee" per month is interest by another name and is subject to the usury ceilings above.
Sources
- California CCP §116.221
- California CCP §116.220
- California CCP §116.320
- California CCP §337
- California B&P §7031
- California Civ. Code §8412
- California Civ. Code §8416
- California Civ. Code §8460
- California Civ. Code §8200
- California Civ. Code §8800
- California Civ. Code §3289
- Texas Gov't Code §27.031
- Texas Gov't Code Prop. Code §53.052
- Texas Gov't Code §53.254
- Texas Gov't Code §53.158
- Texas Gov't Code §28.002
- Texas Gov't Code §28.003
- Texas Gov't Code §28.004
- Texas Gov't Code Fin. Code §302.001
- Texas Gov't Code §302.002
- Texas Gov't Code CPRC §16.004
- Florida Stat. §489.128
- Florida Stat. §713.08
- Florida Stat. §713.06
- Florida Stat. §713.22
- Florida Stat. §713.015
- Florida Stat. §715.12
- Florida Stat. §687.01
- Florida Stat. §687.02
- Florida Stat. §55.03
- Florida Stat. §95.11
- Florida Small Claims Rule 7.010 (mirror)
- Florida Small Claims Rule 7.010 (mirror) Miami-Dade Clerk
- Florida Small Claims Rule 7.010 (mirror) interest rate (Florida Bar News, 2026-07-01)
- Arizona A.R.S. §22-503
- Arizona A.R.S. §22-201
- Arizona A.R.S. §33-993
- Arizona A.R.S. §32-1153
- Nevada NRS 73.010
- Nevada NRS 73.010 NRS 108.226, 108.233
- Nevada NRS 73.010 NRS 624.320
- New York CCA §1801
- New York CCA UJCA §1801
- New York CCA Lien Law §10
- New Jersey small claims (NJ Courts)
- New Jersey small claims (NJ Courts) N.J.S.A. 2A:44A-6
- New Jersey small claims (NJ Courts) 2A:44A-21
- Illinois Sup. Ct. R. 281
- Illinois Sup. Ct. R. 281 770 ILCS 60/7
- Georgia O.C.G.A. §15-10-2
- Georgia O.C.G.A. §44-14-361.1
- Georgia O.C.G.A. §43-41-17
- North Carolina G.S. 7A-210
- North Carolina G.S. 7A-210 G.S. 44A-12
- Virginia Code §16.1-122.2
- Federal FDCPA, 15 U.S.C. §1692a
- Pennsylvania 42 Pa.C.S. §1515
- Pennsylvania 42 Pa.C.S. §5525
- Pennsylvania 42 Pa.C.S. 49 P.S. §1502
- Pennsylvania 42 Pa.C.S. §1301
- Pennsylvania 42 Pa.C.S. 73 P.S. §517.7
- Pennsylvania 42 Pa.C.S. 41 P.S. §202
- Ohio R.C. 1925.02
- Ohio R.C. 1925.02 1311.06
- Ohio R.C. 1925.02 1311.011
- Ohio R.C. 1925.02 2305.06
- Ohio R.C. 1925.02 2305.07
- Ohio R.C. 1925.02 1343.03
- Ohio R.C. 1925.02 5703.47
- Ohio R.C. 1925.02 2026 rate (Weltman)
- Michigan MCL 600.8401
- Michigan MCL 600.8401 570.1111
- Michigan MCL 600.8401 570.1114
- Michigan MCL 600.8401 570.1118a
- Michigan MCL 600.8401 339.2412
- Michigan MCL 600.8401 600.5807
- Michigan MCL 600.8401 438.31
- Washington RCW 12.40.010
- Washington RCW 12.40.010 60.04.091
- Washington RCW 12.40.010 60.04.141
- Washington RCW 12.40.010 60.04.031
- Washington RCW 12.40.010 18.27.114
- Washington RCW 12.40.010 18.27.080
- Washington RCW 12.40.010 4.16.040
- Washington RCW 12.40.010 4.16.080
- Washington RCW 12.40.010 19.52.010
- Colorado C.R.S. 13-6-403
- Colorado C.R.S. 13-6-403 38-22-109
- Colorado C.R.S. 13-6-403 38-22-102
- Colorado C.R.S. 13-6-403 13-80-101
- Colorado C.R.S. 13-6-403 13-80-103.5
- Colorado C.R.S. 13-6-403 5-12-102
- Massachusetts G.L. c.218 §21
- Massachusetts G.L. c.218 c.254 §2
- Massachusetts G.L. c.218 §8
- Massachusetts G.L. c.218 §11
- Massachusetts G.L. c.218 c.260 §2
- Massachusetts G.L. c.218 c.231 §6C
- Massachusetts G.L. c.218 c.107 §3
- Massachusetts G.L. c.218 c.142A §17
- Maryland CJ §4-405
- Maryland CJ RP §9-105
- Maryland CJ RP §9-104
- Maryland CJ CJ §5-101
- Maryland CJ CL §12-102
- Maryland CJ Bus. Reg. §8-601
- Maryland CJ Const. art. III §57
- Minnesota Stat. 491A.01
- Minnesota Stat. 491A.01 514.08
- Minnesota Stat. 491A.01 514.011
- Minnesota Stat. 491A.01 326B.845
- Minnesota Stat. 491A.01 541.05
- Minnesota Stat. 491A.01 334.01
- Tennessee T.C.A. 16-15-501
- Tennessee T.C.A. 16-15-501 66-11-106
- Tennessee T.C.A. 16-15-501 66-11-112
- Tennessee T.C.A. 16-15-501 66-11-146
- Tennessee T.C.A. 16-15-501 62-6-103
- Tennessee T.C.A. 16-15-501 28-3-109
- Tennessee T.C.A. 16-15-501 47-14-103
- Indiana IC 33-29-2-4
- Indiana IC 33-29-2-4 32-28-3-3
- Indiana IC 33-29-2-4 32-28-3-6
- Indiana IC 33-29-2-4 32-28-3-1
- Indiana IC 33-29-2-4 34-11-2-7
- Indiana IC 33-29-2-4 34-11-2-9
- Indiana IC 33-29-2-4 34-11-2-11
- Indiana IC 33-29-2-4 24-4.6-1-102
- Missouri RSMo 482.305
- Missouri RSMo 482.305 429.080
- Missouri RSMo 482.305 429.012
- Missouri RSMo 482.305 429.013
- Missouri RSMo 482.305 516.120
- Missouri RSMo 482.305 516.110
- Missouri RSMo 482.305 408.020
- Wisconsin Stat. 799.01
- Wisconsin Stat. 799.01 779.06
- Wisconsin Stat. 799.01 779.02
- Wisconsin Stat. 799.01 893.43
- Wisconsin Stat. 799.01 138.04
- Wisconsin Stat. 799.01 101.654
- Oregon ORS 46.405
- Oregon ORS 46.405 87.035
- Oregon ORS 46.405 87.093
- Oregon ORS 46.405 701.131
- Oregon ORS 46.405 12.080
- Oregon ORS 46.405 82.010
- Utah Code 78A-8-102
- Utah Code 78A-8-102 38-1a-501
- Utah Code 78A-8-102 38-1a-502
- Utah Code 78A-8-102 38-11-107
- Utah Code 78A-8-102 38-11-204
- Utah Code 78A-8-102 58-55-604
- Utah Code 78A-8-102 78B-2-309
- Utah Code 78A-8-102 78B-2-307
- Utah Code 78A-8-102 15-1-1
- Federal FDCPA §1692g
Related Reading
- Contractor Deposit Limits By State
- Home Improvement Contract Requirements By State
- How To Invoice As A Contractor
Free contractor software by trade
- Free HVAC software — scheduling, quoting, and invoicing for HVAC contractors.
- Free plumbing software — service-call quotes, dispatch, and online payments for plumbers.
- Free electrical contractor software — quotes with photos, scheduling, and invoicing for electricians.
- Free handyman software — fast quotes, scheduling, and invoicing for solo handymen and small crews.
- Free landscaping software — recurring schedules, crew dispatch, and invoicing for lawn care and landscaping.
- Free cleaning business software — recurring scheduling, online booking, and invoicing for house cleaners.
- Free pest control software — treatment scheduling, service history, and invoicing for pest control technicians.
- Free roofing software — line-item estimates, photo documentation, and online deposits for roofing contractors.
- Free painting contractor software — itemized estimates with photos, scheduling, and invoicing for painters.
- Free online booking for contractors — an embeddable booking widget that lets customers book from your website 24/7.
- Free contractor calculators — estimating tools that print their formula and end in a quote, starting with the painting estimate calculator.
- Free contractor calculators — estimating tools that print their formula and end in a quote, starting with the painting estimate calculator.