Painting Production Rates

A painter rolling smooth interior walls covers about 150 to 250 square feet per hour per coat; ceilings 125 to 200; brushed trim 50 to 100 linear feet; airless spray on open walls 600 to 1,000. Hours are area times coats divided by the rate, plus a prep allowance. 1,800 square feet of walls at two coats with light prep is 20.7 painter-hours, or 1.3 crew-days for two painters, and prices at $1,231 in labor on industry-default rates.

Updated 2026-10-21 · by Devon Davila, Founder, Krib · methodology and sources below

The interactive calculator on this page needs JavaScript. The method, constants and worked examples below are the same ones it uses.

What this calculates

Painter-hours for one surface type: your area or count, times coats, divided by the production rate for the crew speed you pick, plus a percentage for prep. Then hours on site for your crew size, crew-days at eight hours, gallons at standard coverage, and a labor-only price from burdened wages, overhead, general and administrative cost, and your target margin. The rate table below is the reference; the calculator is the table with your numbers in it.

Formula

hours_per_coat = quantity ÷ production_rate   (or count × hours_each for doors)
paint_hours    = hours_per_coat × coats
prep_hours     = paint_hours × prep_allowance   (none 0%, light 15%, heavy 35%)
painter_hours  = paint_hours + prep_hours
crew_days      = painter_hours ÷ (painters × 8)
gallons        = ceil( quantity × coats ÷ coverage )
labor_price    = painter_hours × wage × (1 + burden) × (1 + overhead) × (1 + G&A) ÷ (1 − margin)

Assumptions and sources

ConstantDefaultSourceAs of
Walls, roll and cut in150 / 200 / 250 sq ft per hourPDCA Craftsman's Manual and PCA guidance; slow / medium / fastOct 2026
Ceilings, roll and cut in125 / 150 / 200 sq ft per hourSame sources; overhead work is slower than wallsOct 2026
Textured walls75 / 110 / 150 sq ft per hourSame sources; texture roughly halves roller speed and coverageOct 2026
Trim and baseboard, brush50 / 70 / 100 linear ft per hourSame sourcesOct 2026
Doors, both sides0.75 / 0.5 / 0.35 hours each per coatSame sources; slab doors, brush and mini-rollerOct 2026
Exterior siding, spray and back-roll250 / 300 / 400 sq ft per hourSame sources; masking time is in the prep allowanceOct 2026
Airless spray only, open walls600 / 800 / 1,000 sq ft per hourPaintPricing production ratesOct 2026
Prep allowancenone 0% · light 15% · heavy 35%Share of painting hours for patching, caulk, sanding, masking; heavy prep on bad surfaces can exceed painting time and deserves its own line—
Coverage350 sq ft/gal walls and ceilings · 300 exterior · 600 lf/gal trimManufacturer spec sheets (350–400 on smooth, previously painted surfaces)Oct 2026
Painter wage · burden · overhead · G&A · margin$26/h · 22% · 25% of labor · 5% · 30%BLS OES 47-2141 median wage; Krib painting seed rate card for the restOct 2026

Worked examples

1,800 sq ft of walls, two coats, typical crew of two

The default. A three-bedroom interior's wall area, light prep, medium production rate.

Production rate200 sqft/h per coat
Hours per coat9.0 h
Painting hours18.0 h
Prep allowance2.7 h
Painter-hours20.7 h
Crew-days (8 h)1.3 (2 painters)
Paint, rounded up11 gal
Recommended labor price$1,231.13 (30% margin = 42.9% markup)
Billed per hour$59.48/h

Open this example in the calculator

420 linear feet of trim, two coats, careful painter working alone

Brush work goes slowly and does not benefit from a second painter; no prep because the trim is new.

Production rate50 lf/h per coat
Hours per coat8.4 h
Painting hours16.8 h
Prep allowance0.0 h
Painter-hours16.8 h
Crew-days (8 h)2.1 (1 painter)
Paint, rounded up2 gal
Recommended labor price$999.18 (30% margin = 42.9% markup)
Billed per hour$59.47/h

Open this example in the calculator

What changes the number

What painters bill per hour

$55 – $75 per painter-hour — residential interior, United States, 2026. Public sources, verified Oct 2026.

Public-source range for the billed rate, which already carries burden, overhead and profit. The calculator's labor price divided by painter-hours should land in or near this range; if it does not, your overhead or margin is the reason.

Production rate reference table

SurfaceUnitSlowMediumFastCoverage
Interior walls, roll and cut insqft / painter-hour150200250350 sq ft/gal
Ceilings, roll and cut insqft / painter-hour125150200350 sq ft/gal
Textured walls, rollsqft / painter-hour75110150275 sq ft/gal
Trim and baseboard, brushlf / painter-hour5070100600 sq ft/gal
Doors, both sides, brush and rollhours each0.750.50.350.12 gal each
Exterior siding, spray and back-rollsqft / painter-hour250300400300 sq ft/gal
Open walls, airless spray onlysqft / painter-hour6008001000300 sq ft/gal

Per coat, per painter, including normal cut-in; prep excluded. Ranges compiled from Painting and Decorating Craftsman's Manual and Textbook, PCA, PaintPricing, painting production rates. "Slow" is a new or careful painter, "medium" a typical residential crew, "fast" a production crew on open walls. Time one room with your own crew and use that column.

Questions painters ask

How many square feet can a painter paint per hour?

Rolling smooth interior walls, 150 to 250 square feet per hour per coat; ceilings 125 to 200; textured walls 75 to 150. Brushing trim runs 50 to 100 linear feet per hour. Airless spraying open walls reaches 600 to 1,000 square feet per hour before masking time.

How long does it take to paint a 12×12 room?

A 12×12 room with 8 ft ceilings has about 350 square feet of wall after openings. Two coats on walls, one on the ceiling and the trim come to roughly 5 to 7 painter-hours for a typical crew, plus prep. One painter does it in a day; two in a morning.

How many square feet can a painter paint in a day?

Roughly 1,200 to 2,000 square feet of wall per painter per eight-hour day at two coats, depending on cut-in, height and prep. Production crews spraying open walls can pass 4,000. Use the calculator's crew-days figure for your actual mix.

How much faster is spraying than rolling?

On the wall itself, three to five times faster. Masking, covering floors and back-rolling eat much of that gain in occupied homes, which is why the spray rate here is paired with a prep allowance rather than used alone.

How do I measure my own crew's production rate?

Time one representative room from first cut-in to last roller stroke, divide the painted square feet by the painter-hours, and repeat on two more jobs. That average, not a published table, is the rate to price with. Put it into the quantity and hours and use the price that results.

Does the rate include prep work?

No. Published production rates are for applying paint. Patching, caulking, sanding and masking are added here as a percentage of painting hours, and on bad surfaces they should be a separate line in the quote.

What is a crew-day?

Painter-hours divided by painters on the job and an eight-hour day. Twenty painter-hours is 2.5 days for one painter or 1.25 days for two. It is the number that lets you schedule the next job.

Can I turn these hours into a quote?

Yes. "Send this as a quote" opens a labor line in Krib's quote builder with the hours and your billed rate filled in. Krib is free for contractors, with no monthly fee; add materials and prep lines and your customer accepts online.

Related

Turn these hours into a quote your customer can accept online

The labor line opens in Krib's quote builder with hours and rate filled in. Add paint and prep, send, get paid. Free for contractors, no monthly fee.

Send this as a quote